Texas Instruments TAA3040EVM-PDK Evaluation Module
Texas Instruments TAA3040EVM-PDK Product Development Kit (PDK) is designed to quickly and easily demonstrate the capabilities of the TAA3040, a quad-channel, high-performance audio analog-to-digital converter (ADC). The TAA3040 is intended for voice-activated systems, professional microphones, audio conferencing, portable computing, communication, and entertainment applications.The TI TAA3040EVM-PDK product development kit is paired with the AC-MB, a flexible motherboard that provides power, control, and digital audio data to the evaluation module.
Features
- Complete evaluation kit for the TAA3040 quad-channel audio ADC
- High-performance audio ADC at 104dB dynamic range
- Direct access to digital audio signals and control interface for simple end-system integration
- Onboard microphones provided for voice recording testing
- USB connection to PC provides power, control, and streaming audio data for easy evaluation
Applications
- Smart speakers
- IP network cameras
- Professional microphones and wireless systems
- Video conference systems
Kit Contents
- TAA3040 device
- TAA3040 EVM/daughterboard
- AC-MB controller/motherboard
TAA3040EVM-PDK & AC-MB System Overview
AC-MB Audio Serial Interface Routing
Input Architecture
Publicado: 2025-02-18
| Actualizado: 2025-02-28
